Determine groundwater elevations at site monitoring wells and draw groundwater
elevation contours for the Former Radiator Factory site using monitoring well information
and depth to groundwater measurements. Assume depth to groundwater is recorded as
depth from the top of the INNER CASING. Estimate the hydraulic gradient?
Turnitin Report
Formatting
Title Page
Citation
Outline